Minister Anura Karunathilaka stated that drinking water coverage varies across the named areas, with Kakkachchiwattai about 60 per cent covered, Vilanthottam under 40 per cent, and no facilities in Tharmapuram–Kirankulam. He outlined planned measures including an additional transmission main from the Vadayantalawa storage tank, a new storage tank and pump house at Vellaveli under the Mandur Water Supply Scheme, and distribution extensions for higher-elevation areas. He added that a 2.5 km pipeline extension for Tharmapuram–Kirankulam has been included in the 2025 CEDE budget, and that the National Community Water Supply Department will not initiate separate projects where NWS&DB coverage applies.

Verbatim record (translated)

Machine-translated from Sinhala / Tamil / English

¶ 01 The answer is as follows.

¶ 02 (a) (i) As per the report of the Water Supply Division, coverage is as follows: - Kakkachchiwattai: ~60% covered via Madakalapuwa-Mandur Water Supply Scheme. - Vilanthottam: less than 40% covered via Ampara-Konagolle Water Supply Scheme. - Dikkodai and Thumpankeni: [part of the above coverage mix]. - Tharmapuram–Kirankulam: No drinking water facilities provided.

¶ 03 (ii) Steps to provide facilities: - To satisfactorily cover Kakkachchiwattai, Vilanthottam, Dikkodai and Thumpankeni, an additional transmission main from the Vadayantalawa storage tank up to the required reach will be laid to augment flows from the Vadayantalawa tank (Himudurawa intake) to Mandur. - Under the Mandur Water Supply Scheme, a new storage tank with a pump house at Vellaveli is planned to supply the entire Porativu Pattu DS Division. - Distribution extensions from the proposed tank to higher elevations have been identified under the integrated plan and are at planning stage. - For Tharmapuram–Kirankulam (Manmunai Pattu), a 2.5 km pipeline extension is required; this has been included in the 2025 CEDE (Capacity Enhancement & Distribution Expansion) budget for funding. - As per departmental policy, the National Community Water Supply Department intervenes only where NWS&DB does not provide coverage; therefore, no separate new projects are planned by the Department where NWS&DB schemes apply.

¶ 04 (b) Not applicable.

Provenance

Source
Hansard, Friday, 7 February 2025 ·No. 1739786070060795 ·English daily/uncorrected Hansard
Page · column
not yet extracted — page/column anchors are not in the current dataset; the source PDF is the citable location.
Permalink
/lk/speeches/22981

Cite as: The Hon. Anura Karunathilaka - Minister of Urban Development, Construction and Housing. 10th Parliament, Parliament of Sri Lanka. Hansard, 7 February 2025. No. 1739786070060795. Politick, https://staging.politick.io/lk/speeches/22981