Minister Kumara Jayakody responded to claims that a recent coal shipment to the Lakvijaya Power Plant was substandard, stating that loading-port certificates for the 60,000 metric ton shipment from South Africa met the tender specifications. He said final payment would depend on the accredited discharge-port quality report from Cotecna Inspection India, and that contractual penalties or double penalties would apply if quality parameters fall below specified or reject ranges. He noted that preliminary in-house tests showed lower GCV values but were not contractually binding, and said the Ministry would act only on the accredited report while also objecting to unauthorized use of new stock and publicizing of unverified results.

Verbatim record (translated)

Machine-translated from Sinhala / Tamil / English

¶ 01 Hon. Speaker, I wish to respond to the publicity given to a claim that a recent coal shipment to the Lakvijaya Power Plant was substandard. The first shipment under the new supplier, Trident Chemphar Limited, consists of about 60,000 metric tons from South Africa’s RBCT terminal. At loading, quality certificates matched the specified parameters—most importantly Gross Calorific Value (GCV) of 5,900–6,150 kcal/kg and other criteria (moisture, ash, sulfur, volatile matter) per tender clauses 5 and 5.1—so unloading proceeded. Upon matching documents, a Letter of Acceptance allows payment of 80%. Due to some documentary deficiencies, this 80% has not yet been finalized.

¶ 02 Final payment is made after the discharge port quality certificate is issued by Cotecna Inspection India (Pvt) Ltd, selected by the CEB. This report should arrive within 10 days of completion of discharge, i.e., before mid-January.

¶ 03 Under the contract, if the discharge-port quality is lower than at the loading port (within the specified ranges), penalties are deducted before payment. If any parameter falls into the reject range listed under clause 5.2, then under clause 5.6 double penalties apply.

¶ 04 Preliminary in-house tests at the Lakvijaya lab showed GCV values such as 5689, 5739, 5760 and 5830, indicating results toward the lower end. However, our plant laboratory is not accredited for certification; only an accredited lab report designated in the contract is binding. Therefore, we will act strictly according to the accredited discharge-port report.

¶ 05 Additionally, there was previous stock ordered last year available through end-February. Using new stock before fully consuming old stock, and publicizing results without proper authorization, is not acceptable and is not acknowledged by the supplier. We will proceed strictly per the contract once the accredited report is received.

Provenance

Source
Hansard, Wednesday, 7 January 2026 ·No. 23112 ·English daily/uncorrected Hansard
Page · column
not yet extracted — page/column anchors are not in the current dataset; the source PDF is the citable location.
Permalink
/lk/speeches/23302

Cite as: The Hon. Kumara Jayakody - Minister of Energy. 10th Parliament, Parliament of Sri Lanka. Hansard, 7 January 2026. No. 23112. Politick, https://staging.politick.io/lk/speeches/23302