10th Parliament· 154 sittings on record · 30,475 speeches · latest 10 June 2026

The Hon. Ravindra Bandara

9 January 2025 ·Oral question: Oral Questions

InfrastructureEnvironment
AI summary generated by gpt-5.5

Hon. Ravindra Bandara asked the Minister of Energy for details on power stations added to the National Grid since 2019, including their names, expected and current generation capacity, and which of them are renewable energy plants. He also requested separate generation figures for each renewable station. He further sought information on planned National Grid expansion and renewable energy expansion over the next two years, or reasons if no such plans exist.

Verbatim record (translated)

Machine-translated from Sinhala / Tamil / English

¶ 01 Question to the Minister of Energy: POWER STATIONS ADDED TO NATIONAL GRID FROM 2019: POWER GENERATION (182/2024)

¶ 02 (a) (i) The number and names of power stations added to the National Grid since 2019; (ii) The expected generation capacity of each and the generation at present, separately; (iii) Out of the above, the number of renewable power stations; (iv) Their names; and (v) The generation of each, separately.

¶ 03 (b) (i) Plans for expansion of the National Power Grid in the next two years; and (ii) Plans to expand renewable energy?

¶ 04 (c) If not, why?

Provenance

Source
Hansard, Thursday, 9 January 2025 ·No. 1738229262040729 ·English daily/uncorrected Hansard
Page · column
not yet extracted — page/column anchors are not in the current dataset; the source PDF is the citable location.
Permalink
/lk/speeches/23656

Cite as: The Hon. Ravindra Bandara. 10th Parliament, Parliament of Sri Lanka. Hansard, 9 January 2025. No. 1738229262040729. Politick, https://staging.politick.io/lk/speeches/23656